Call

Illustration: lightning strikes a house with no lightning protection and its attic catches fire. Next door, lightning strikes a house with a lightning protection system and the current runs down into the ground, with no fire.

Lightning always
finds a way down

Florida is struck more than any other state. Lightning rods don’t stop the strike — they decide where it goes, and it isn’t through your house.

  • Licensed Florida PE
  • UL-listed materials
  • Designed to NFPA 780
  • Fully insured
What we install

Lightning rods for
every kind of building

Residential, commercial and public work, anywhere in Florida. Whatever the structure, the goal is the same — keep the energy out of it, and keep the people and property inside it safe.

01

Residential

Lightning rods for single-family homes, villas and estate properties.

  • Lightning rod design and installation
  • Surge protection and grounding
  • Inspection and recertification
  • Free on-site assessment
02

Commercial

Offices, warehouses, retail and multi-unit buildings where downtime and equipment loss carry real cost.

  • Engineered system design
  • Roof-mounted and structural systems
  • Equipment and data surge protection
  • Scheduled inspection programmes
03

Public & Institutional

Schools, churches, hospitals and municipal facilities — where Florida code and insurers set the standard.

  • Code-compliant engineered design
  • Signed and sealed documentation
  • Agency and inspector coordination
  • Bid and specification support
Why you need them

The most lightning-prone
state in America

Florida leads the United States in lightning strike density. From the Panhandle to the Keys this is not a rare event — it is a seasonal certainty. The good news is that it is also one of the very few hazards you can do something about in advance.

#1
Florida leads the nation in lightning strike density
~70%
of Florida's annual lightning falls in June, July and August
July
the single heaviest month of the storm season
Illustration of how lightning rods work on a Florida home: the strike is caught by the air terminal on the roof, guided down the copper conductor along the wall, and dispersed into the ground.
Catching the strike, guiding it down the outside of the building, and dispersing it into the earth — the three jobs every system has to do.

What a lightning rod system actually does

A lightning rod system does not attract lightning, and it does not stop a strike from happening. What it does is decide where the energy goes.

Without a system, a strike finds its own path to ground — through roof timbers, plumbing, wiring, HVAC and electronics, which is how strikes start fires and destroy appliances. With a system, the lightning rods on the roof — properly called air terminals — accept the strike and carry it safely past the building.

Without protection
1Enters the roof 2Into the wiring 3Fire & damage

The strike enters the structure and travels through whatever conducts — wiring, plumbing, HVAC. This is how strikes start fires and destroy electronics.

With a protection system
1Caught here 2Carried outside 3Into the earth

Air terminals accept the strike, conductors carry it down the outside of the building, and ground electrodes disperse it. The energy never enters the structure.

Why this is worth doing now

A strike does not politely pick one thing to ruin. It can take the roof, the air conditioning, the well pump, the television and every appliance in the house in the same second — and the fire risk that comes with it is the part that threatens people, not just property.

Florida already knows this. State code requires lightning protection on new schools, hospitals, nursing homes and correctional facilities — the buildings where lives are least negotiable. The same physics applies to your house. The difference is that nobody makes you do anything about it.

The best time to install lightning rods is before the storm

A free on-site assessment tells you exactly what your building needs — no charge, no obligation, no pressure.

Book your free assessment
Our process

From the first visit
to the final paperwork

Straightforward, and mostly out of your way. We look at your building, design a lightning rod system to NFPA 780 for its roof and grounding conditions, install it, and hand you the documentation your insurer and your inspector will ask for.

Step 01

Assessment

We come to the property and tell you plainly how many lightning rods the building needs and where they go.

Step 02

Design

A system designed to NFPA 780 for your structure — roof geometry, materials and grounding all change the answer.

Step 03

Install

Copper conductors, bonded grounding, and surge protection where it belongs. Most homes finish in a day.

Step 04

Documents

The paperwork your insurer and inspector will ask for, signed and sealed where required.

Also offered

Civil engineering

Led by Beau Keene, PE — a University of Florida engineering graduate with over 35 years in private practice and local government public works management. Signed and sealed documents where a project requires them.

Design & Permitting

  • Site development and subdivision plans
  • Stormwater and drainage design
  • Grading, paving and roadway design
  • Water, sewer and utility infrastructure
  • Erosion and sediment control, NPDES
  • Permitting and agency coordination

Construction & Project Delivery

  • Construction management and owner’s representation
  • Bid documents, procurement and contractor selection
  • Construction inspection and quality oversight
  • Scheduling, cost estimating and value engineering
  • Change order and claims review
  • Project close-out and as-built documentation

Public Works & Municipal

  • Contract city engineering and plan review
  • Capital improvement planning and budgeting
  • Stormwater utility and MS4 compliance
  • ADA transition plans and accessibility review
  • Asset management and maintenance programmes
  • Post-storm damage assessment and FEMA documentation

Advisory & Funding

  • Feasibility studies and land due diligence
  • Grant engineering support — FEMA, Resilient Florida, SRF
  • Drainage and grading review for property owners
  • Retention pond assessment and remediation planning
  • Resilience and flood risk assessment
  • Expert witness and litigation support
Roof runoff Graded pavement Vegetated swale Retention pond Control structure Outfall Design storm water surface STORMWATER — SECTION
Swipe sideways to see the whole sectionTypical stormwater section: runoff from roofs and pavement is graded to a vegetated swale, conveyed to a retention pond, and released through a control structure at a permitted discharge rate. Schematic — every site is modelled to its own soils, storm event and outfall conditions.
Credentials

Quality
assured

Who you let onto your roof matters, and so does what goes on it. Every credential below is verifiable — including the two still in progress, which we mark as such rather than imply otherwise.

Licensed Florida PE

Beau Keene, PE — University of Florida graduate, 35+ years in private practice and local government public works.

UL-Listed materials only

Every air terminal, conductor, connector and electrode listed to UL 96.

Designed to NFPA 780

The national installation standard inspectors and insurers work from.

Fully insured

General liability, workers’ compensation and professional liability. Certificates on request.

UL Listed Installer

UL 96A training scheduled October 2026.

In progress

Better Business Bureau

Accreditation applied for; rating shown once issued.

Applied
Free assessment

Protect your home
and everyone in it

Protect yourself, your home and your loved ones today. Call for a free consultation with our team — we come out, look at the building, and give you a straight answer about whether it needs lightning rods and what that would cost.

Your name and a phone number or email is all we need.

A real person from our family will reply within one business day.

or call
CallFree assessment